Charging Post Without Trenching!
 Charging Post Without Trenching! 
Patented method
 Our solution! 
Remove existing paving stones
 Remove! 
Mount our cable channel modules
 Install! 
Ready fo service
 Ready! 
Quick, Simple, Agile and Cost Efficient
 Quick & Cost Efficient 

Our solution enables electri­fication of urban spaces with minimal groundworks.

Existing paving stones are replaced with our cast iron modules. The power cables are placed inside the modules and are protected from snow plows, ground movements, vandalism, etc.

The solution enables a flexible step-by-step implementation and makes the city planning adaptable for future needs and changes.